     With the Woolfolk Building re-roof project, Malone embarked on an ambitious trajectory to prove that we could roof one of the tallest most complex roofing structures in the state. As of July 2019, Malone has accomplished that mission.

     Malone was one of only three bidders on this challenging project. The challenges lied with access to the roofs, the height above ground level, tie off capabilities and the confined nature of certain work spaces. The project consisted of 25 separate roofs on elevations ranging up to 190 feet. This project was 49,000 square feet. The roof assembly was as follows: Removing the existing lightning protection and roof system down to the structural concrete deck, Adhere a ¼” tapered insulation with a 3” minimum thickness sloped to internal drains, adhere a ½” dens-deck prime cover board, torched 1 ply of Firestone SBS Glass Torch Base and 1 ply of Firestone SBS FR Torch Cap, flashed with vertical surfaces and penetrations with 1 ply of Firestone SBS Glass Torch Base and 1 ply Firestone Metal Flash AL, metal counterflashing was fabricated in .040 aluminum. The lightning protection was reinstalled with new parts as needed for recertification as well. What made install of tapered insulation such a challenge was due to the very confined work areas and the sheer volume of materials. Simply put, multiple layers of insulation, virtually no access and small work space equals a tough challenging environment. In regards to access, some of the roofs could only be accessed from the air. Meaning materials and crews had to be air lifted with a crane plus a material bucket or man basket accordingly. Furthermore, one particular large chiller for the woolfolk building's HVAC required our crews to crawl under and out, while working on hands and knees, for 3 weeks, with only 2 ½ feet of clearance space.

     Safety on this job, in particular fall protection, is always of utmost importance. On this project, Malone crews worked at high elevations with low parapet walls, this translates to 100 percent safety tie off for the entire job. This meant nowhere to tie off, with a small work area, 150 feet in the air. Therefore, Malone found parapet clamps that attached to the tops of the parapet walls and then our crews attached to the secured clamps. There were no safety plan failures or injuries throughout the entire project.

Return to 2019 Malone makeovers

Jackson, MS Office

439 Dory Street
Jackson, MS 39201
Phone: (601) 352-5940
Fax: (601) 352-5944
MS LIC.NO.– 05871-MC

Alexandria, LA Office

4106 Lee Street,
Alexandria, LA 71302
Phone: (318)-532-6492
Fax: (318)-532-6492
LA LIC. NO. 17812

Knoxville, TN Office

6214 Enterprise Drive,
Knoxville, TN 37919
Phone: (865)770-4441
Fax: (865)-249-6928
TN LIC. NO. 58848

Hattiesburg, MS Office

#1 Commerce Drive, Suite 200
Hattiesburg, MS 39402
Phone: (601) 336-7008
Fax: (601) 602-4369
MS LIC. NO.– 05871-MC

New Orleans, LA Office

1301 Edwards Ave. Suite B.,
New Orleans, LA 70123
Phone: (504) 930-4405
Fax: (504) 930-4405
LA LIC. NO. 17812

Baton Rouge, LA Office

9352 South Choctaw
Baton Rouge, LA 70815
Phone: (225) 218-4475
Fax: (225) 388-5415
LA LIC. NO.- 17812

Pensacola, FL Office

2550 N.Palafox Street
Pensacola, FL 32501
Phone: (850) 429-1577
Fax: (850) 429-1578
FL LIC. NO.– CCC39870

Mobile, AL Office

7949 Bullitt Drive,
Mobile, AL 36619
Phone: (251) 308-2135
Fax: (251) 308-2162
AL LIC. NO. 41604

Birmingham, AL Office

2621 Queenstown Road,
Birmingham, AL 35210
Phone: (205) 994-8449
Fax: (205) 994-8449
AL LIC. NO.- 41604