MS CENTER FOR EMERGENCY SERVICES

2019-2020 PROJECT

PREPARED FOR ANYTHING!


Jackson, MS


Since Hurricane Katrina in 2005, the University of Mississippi Medical Center, the Mississippi Department of Health (MSDH) and the Mississippi Emergency Management Agency (MEMA) have strived to be as prepared as possible for a natural or man-made disaster.  


According to their website, The Mississippi Center for Emergency Services was created to expand Mississippi’s ability to maintain medical services during unanticipated events across Mississippi. E. Cornell Malone Corporation’s roofing and met...More


Since Hurricane Katrina in 2005, the University of Mississippi Medical Center, the Mississippi Department of Health (MSDH) and the Mississippi Emergency Management Agency (MEMA) have strived to be as prepared as possible for a natural or man-made disaster.  


According to their website, The Mississippi Center for Emergency Services was created to expand Mississippi’s ability to maintain medical services during unanticipated events across Mississippi. E. Cornell Malone Corporation’s roofing and metal divisions were able to help this project come to life.


First, let’s take a look at this project from the roofing side. Malone roofers loose laid two layers of 2.2” ISO, then mechanically attached a 19/32” OSB cover board. 


Next, crews installed a Mid-States Quick-Stik High Temp self-adhered underlayment followed by a Petersen Aluminum 16” wide .040 High Snap-On Standing Seam roof panel with offset splices in the middle of the panels. Since the roof is 160-feet long, these were no small panels. 


Each panel was 80-feet long, and was spliced, assembled and staggered along the surface all while remaining water tight. It was a delicate and tedious step that was necessitated due to expansion and contraction on the roof’s surface. 


Our team followed standard OSHA guidelines throughout the project and concluded installation in April of 2020.


The Malone wall panel division was also a critical element of this project. Our crews furnished and installed 20,000 square feet of HWP-16, 1,600 sf of HWP 16 (Perforated), 6,000 square feet of B-2 Highline,12,000 square feet of M-36, and 2,150 square feet of 12" Flush Panel. 


All the panels were manufactured by Petersen Aluminum, in 6 different colors as well as 350 square feet of Citadel 4 mm ACM Wall Panels. 


The project began on March 16, 2019 and was completed on March 16, 2020. Our crews worked out of man lifts on the project while following all safety protocols. All ACM panels and flashings were fabricated by E. Cornell Malone Corporation.


Since 2020, the Center for Emergency Services has occupied it’s new building to better serve the emergency needs of Mississippians. The facility is home to all UMMC Critical Care transport services, Public Safety Support and Mississippi Med-com. Malone was honored to be selected to work on this project. 

Less
RETURN TO 2019 MALONE MAKEOVERS

439 Dory Street

Jackson, MS 39201

Phone: (601) 352-5940

Fax: (601) 352-5944

MS LIC.NO.– 05871-MC

2550 N.Palafox Street

Pensacola, FL 32501

Phone: (850) 429-1577

Fax: (850) 429-1578

FL LIC. NO.– CCC39870

#1 Commerce Drive, Suite 200

Hattiesburg, MS 39402

Phone: (601) 336-7008

Fax: (601) 602-4369

MS LIC. NO.– 05871-MC

9352 South Choctaw

Baton Rouge, LA 70815

Phone: (225) 218-4475

Fax: (225) 388-5415

LA LIC. NO.- 17812

2689 Queenstown Road,

Birmingham, AL 35210

Phone: (205) 994-8449

Fax: (205) 994-8449

AL LIC. NO.- 41604

7949 Bullitt Drive,

Mobile, AL 36619

Phone: (251) 308-2135

Fax: (251) 308-2162

AL LIC. NO. 41604